CDPH Lead Inspector/Assessor California State Practice Exam

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the CDPH Lead Inspector/Assessor California State Exam. Engage with flashcards, multiple choice questions, hints, and explanations. Get exam-ready!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


In lead waste management, what would the waste not exceeding 200 ppm represent?

  1. Soil contamination

  2. Paint residue

  3. Interim control materials

  4. Air quality testing

The correct answer is: Interim control materials

In lead waste management, waste with lead levels not exceeding 200 ppm (parts per million) is categorized as having lower lead content, which is often associated with interim control measures. These materials, such as those used in encapsulation or containment strategies, are designed to manage lead hazards temporarily without necessitating complete removal. The rationale behind this is that items or materials with lead levels below 200 ppm may not be deemed hazardous waste under certain regulatory frameworks, allowing for more flexible management options while still addressing potential lead exposure risks. This distinction is important in practical applications because it informs decisions regarding handling, storage, and disposal of materials that may still pose a risk but are not classified as hazardous waste by exceeding this threshold. Other options such as soil contamination, paint residue, and air quality testing pertain to different contexts or materials and do not specifically relate to the definition of materials under interim control measures in lead waste management.